Analisis Tingkat Risiko Dan Penerapan Smk3 Pada Proyek Pembangunan Rumah Sakit Umum Daerah Mangusada Badung

I Ketut Sutapa, I Wayan Suasira, Putu Hermawati, I Putu Arya Setya Dharma

Abstract


Every construction project, whether high-tech or simple, has risks in the implementation process. there-fore it is necessary to establish a Project Safety Management (PSM), to minimize the risk of occupational safety and health (OSH) of construction project. However there are still many construction companies that are lacking in identifying risks of occupational safety and health(OSH) of construction project and implementing an occupational Project Safety Management (PSM)) in the process of implementing a con-struction project. The purpose of this study was to determine the level of risk occupational safety and health based on existing risk factors, and to measure the application level of SMK3 in a construction pro-ject. In this study, the object of the case study was the construction project of the Mangusada Badung Regional General Hospital, at the time of finishing work. After carrying out risk identification, 4 risk fac-tors are obtained, namely human, material, equipment and environmental factors. then the results of the identification are processed, and the level of risk obtained from the implementa-tion of the Mangusada Badung Regional General Hospital Development Project is included in the Medium Category, with a risk value of 6. Meanwhile, the implementation of the Project Safety Management (PSM) of the Mangusada Badung Regional General Hospital Construction Project was included in the good cate-gory with a total application value of 83%. Hopefully this research will serve as a reference in identifying occupational safety and health (OSH) risks, and a reference in implementing the Occupational Project Sfety Manajemen (PSM).

Keywords


Risk Level, Implementation of SMK3

Full Text:

PDF

References


Ersamayori, Milen (2016). Analisis Level Keselamatan dan Kesehatan kerja (K3) Proyek Konstruksi Terhadap Risiko dan Manajemen K3. Malang : Fakultas Teknik Universitas Lampung

Kurniawan. B. Y (2010). Analisis Risiko Konstruksi Pada Proyek Pembangunan Apartemen Petra Square Surabaya

Febyana. P (2012). Penerapan Sistem Manajemen Keselamatan dan Kesehatatan Kerja (SMK) Pada Proyek Konstruksi di Indonesia

Anonim. (2012) Penerapan Sistem Manajemen Keselamatan Dan Kesehatan Kerja. Jakarta : Peraturan Pemerintah Republik Indonesia Nomor 50 Tahun 2012.

Project Management Body of Knowledge (PMBOK). A Guide Project Management Body of Knowledge – 2000 edition. Project Manajement Institite Newtown Square. Pennsylvania USA. 2003

Anonim. (2019). Pedoman Sistem Manajemen Keselamatan konstruksi. Jakarta : Peraturan Menteri Pekerjaan Umum Dan Perumahan Rakyat Republik Indonesia Nomor 21 Tahun 2019.

Sugiyono. (2016), Metode Penelitian Kuantitatif,Kualitatif dan R&D. Bandung : PT Alfabet

Suma’mur. (2009). Keselamatan Kerja dan Pencegahan Kecelakaan.Jakarta. CV Haji Masa-gung,

Suardi, Rudi (2007). Sistem Manajemen Keselamatan dan Kesehatan Kerja. Jakarta: PPM.

Tarwaka. 2008. Keselamatan dan Kesehatan Kerja. Surakarta: HARAPAN PRESS.




DOI: http://dx.doi.org/10.30630/jipr.17.1.213

Refbacks

  • There are currently no refbacks.