METODE PELAKSANAAN PEKERJAAN TANGGUL BIOGAS STUDI KASUS : PROJECT OF BIOGAS (COVERED LAGOON) TO FLARING MSL CARGILL

Wahyu Araska, Rangga Fernando, Ilham Ahmad Syauki

Abstract


Soft soil work is a major challenge in berm construction due to the physical and mechanical characteristics of the soil. Soft soil generally has high moisture content, large porosity, and weak grain structure, which leads to very low soil bearing capacity. These conditions result in the soil being unable to support the construction load optimally, thus increasing the risk of settlement and lateral deformation. These factors create challenges in the planning and execution of earthworks, as specialized methods are required to improve the soil's stability and strength to ensure the berm functions safely and effectively. The proper working methods for handling soft soil can maintain the stability and safety of the embankment. These methods include replacing the original soil, stabilizing the soil using dolken piles and gradual mechanical compaction.The research results show that the success of berm construction is greatly influenced by thorough technical planning and coordination between work stages. This method has proven effective when applied to soft soil and provides constructive solutions to the technical problems that arise in the field.


Keywords


berm construction, soft soil, implementation method

References


Abdul Rahman, M., & Taqwa, A. (2020). Strategi pengolahan limbah cair pabrik kelapa sawit di PT AMP Plantation. Jurnal Geografi, 12(1), 45–56.

Aditama, K. (2021). TA: Analisa Faktor-Faktor Keberhasilan Manajemen Proyek Pada Pt. Sucofindo (PERSERO)(Studi kasus: Pelaksanaan Pekerjaan PT. Sucofindo (PERSERO) Cab. Kota Bandung Pada Tahun 2009 Hingga 2019) (Doctoral dissertation, Institut Teknologi Nasional).

Balai Standardisasi dan Pelayanan Jasa Industri Pekanbaru. (2020). Teknologi pengolahan limbah POME (Palm Oil Mill Effluent) dengan sistem anaerobik di industri kelapa sawit. Kementerian Perindustrian RI.

Ervianto, W. I. (2023). Manajemen proyek konstruksi. Penerbit Andi.Asiyanto. (2010). Manajemen Produksi Untuk Jasa Konstruksi. Jakarta: PT.Pradaya Pratama

Grinviro Global. (2025). Biogas kelapa sawit: Solusi pengolahan limbah cair dan energi terbarukan.

Hidayat, R., Taqwa, A., & Said, N. (2020). Potensi limbah cair pabrik kelapa sawit sebagai bahan baku energi biogas. Prosiding Seminar Nasional Lahan Suboptimal, 1946, 213–220.

Jawat, I. W. (2015). Metode Pelaksanaan Pekerjaan Pondasi (Studi: Proyek Fave Hotel Kartika Plaza). Paduraksa, II, 22-34.

Jawat, I. W., Gita, P. P., & Dharmayoga, I. M. (2020). Kajian Metode Pelaksanan Pekerjaan Pondasi Bored Pile Pada Tahap Perencanaan Pelaksanaan. Paduraksa, IX, 126-142.

Kementerian Lingkungan Hidup dan Kehutanan. (2016). Guideline for industrial wastewater management in palm oil mills. Ministry of the Environment, Japan – KLHK Indonesia.

Mandak, L. (2016). Perencanaan Dan Metode Pelaksanaan Pondasi Bore Pile Proyek Pembangunan Butik Gunung Langit. Manado: Repository.Polimdo.ac.id.

Mardiaman, ST. MT. (2021). “Manajemen Konstruks”i. Cirebon: CV. Syntax Computama

Nasution, A., & Siregar, H. (2023). Pembuatan biogas memanfaatkan limbah kelapa sawit. Website Program Doktor Ilmu Pertanian, Universitas Medan Area.

Sempurna B., Indriasari., Amir H.P. metode pelaksanaan pekerjaan konstruksi struktur bawah pada perkantoran danayasa tower. Jurnal Teknik FT UMT. Vol 11 no. 01 th. 2022

Siwu, M. M., Pratasis, P. A., & Tjakra, J. (2024). Metode Pelaksanaan Konstruksi Penulangan Plat Lantai Pada Proyek Pembangunan Gedung SMP Negeri 16 Manado. TEKNO, 22(87), 115-123.

Sual, G., Arsjad, T.Tj., Dundu, T.A., (2020). Metode pelaksanaan konstruksi plat lantai pada proyek Pembangunan luwansa hotel and conventions jl. Pumorow kec. Wanea Manado provinsi Sulawesi Utara. Jurnal Sipil Statik, Vol.8 No.6, 944.

Said, N., et al. (2015). Potensi limbah cair pabrik kelapa sawit sebagai sumber energi alternatif. Jurnal Energi dan Lingkungan, 11(2), 67–75

Sugiyono, A. (2019). Kajian tekno ekonomi upgrading biogas berbasis POME dengan teknologi water scrubber. Jurnal Teknologi Rekayasa Energi dan Rekayasa Aplikasi, 3(1), 15–23.

Taqwa, A., & Kurniawan, D. (2018). Karakteristik limbah cair pabrik kelapa sawit dan implikasinya terhadap lingkungan. Jurnal Teknologi Lingkungan, 19(3), 145–154.

Taqwa, A., et al. (2020). Potensi energi terbarukan dari pemanfaatan limbah cair pabrik kelapa sawit. Jurnal Ilmu Lingkungan, 18(2), 101–110.




DOI: http://dx.doi.org/10.30630/jipr.21.1.412

Refbacks

  • There are currently no refbacks.