Analisa Kajian Penggunaan Alat Berat Pada Pekerjaan Tanah Proyek Pembangunan Jalan (Studi Kasus : Zona I Pada Proyek Pembangunan Jalan Tol Padang-Pekanbaru By Pass Km 25)

Jajang Atmaja

Abstract


A project work rarely runs smoothly, usually there will be some obstacles. Excavation, stockpiling, and compaction work is an early stage of road construction that requires heavy equipment assistance. One of the causes of problems that usually arise in earthworks using heavy equipment is in the form of an operator who is not skilled. This study aims to calculate the productivity, cost and time of heavy equipment and calculate the composition of heavy equipment usage. The method used in this study was to collect primary and secondary data. The results of the calculated analysis show that the most efficient composition is in the third alternative, namely 2 Excavators 676.04 m³ / day, 5 Dump Trucks 260.75 m³ / day, 2 Bulldozers; 807.93 m³ / day, 2 SheepFoot Rollers; 1215.90 m³ / day, 2 Vibration Rollers; 1215.90 m³ / day, and 3 Water Tanker Trucks; 479.99 m³ / day with a total cost of IDR 2,131,752,569.29

Keywords


Heavy Equipment, Productivity, Cost, Time

Full Text:

PDF

References


Adibroto, Fauna. Buku Ajar Perkerasan Jalan. Padang: Politeknik Negeri Padang

Adi Suryawan, Kadek. 2019. Manajemen Alat Berat. Yogyakarta : Deepublish

Braja, M. Das. 1995. Mekanika Tanah. Jakarta : Penerbit Erlangga

Hadi, Sofwan. 2020. Alat Berat dan PTM. Yogyakarta : Deepublish

Irkhas, Fauzi. 2019. Tugas Akhir Optimalisasi Faktor- Faktor yang Mempengaruhi Produktivitas Alat Berat. Padang: Politeknik Negeri Padang

Kusjadmikahadi, R. Amperawan, 1999. Studi Keterlambatan Kontraktor dalam Pelaksanaan Proyek Konstruksi di Daerah Istimewa Yogyakarta. Yogyakarta : Universitas Gadjah Mada

Mubarok, Ahmad. 2014. Tugas Akhir Perencanaan Pemakaian Alat Berat Pada Pekerjaan Tanah. Surabaya: Institut Teknologi Sepuluh November

Munsil, Perdana Derry. 2018. Dasar Manajemen Konstruksi Proyek Jalan (Tahapan Pre-Start). Yogyakarta : Deepublish

Pelatihan Inspektor Lapangan Pekerjaan Jalan (Site Inspector Of Roads). 2007. Jakarta : Departemen Pekerjaan Umum

Peraturan Menteri Pekerjaan Umum No. 11/PRT/M/2013. Pedoman Analisis Harga Satuan Pekerjaan Bidang Pekerjaan Umum. Jakarta

Permen PUPR No.28. 2016. Pedoman Analisis Harga Satuan Pekerjaan Bidang Pekerjaan Umum. Jakarta

PT United Tractors. Manajemen Alat Berat. Jakarta Timur

PT Virajaya Riau Putra. 2018. Struktur Perkerasan Jalan Beton. Riau

PUPR. 2018. Spesifikasi Umum 2018, Divisi 5 Perkerasan Berbutir dan Pekerasan Beton Semen. Jakarta

PUPR. 2007. Diklat Penggunaan Bahan dan Peralatan Pekerjaan Jalan dan Jembatan. Jakarta

Rochmanhadi. 1992. Alat-Alat Berat dan Penggunaannya. Jakarta: YBPPU

Rochmanhadi. Kapasitas dan Produktivitas Alat-Alat Berat. Jakarta : Departemen Pekerjaan Umum

Rostiyanti, Susy Fatena. 2008. Alat Berat untuk Proyek Konstruksi. Jakarta: Rineka Cipta

Salim, Agus. 2014. Tugas Akhir Analisis Efisiensi Produktivitas Waktu Kerja Alat Berat Pada Pembangunan Jalan (Studi Kasus : Ruas Jalan Tangkeh – Blang Luah Cs, Woyla Timur). Meulaboh: Universitas Teuku Umar




DOI: http://dx.doi.org/10.30630/jipr.17.1.209

Refbacks

  • There are currently no refbacks.