Analisis Kebutuhan Modal Kerja Kontraktor Berdasarkan Sistem Pembayaran di Gedung Rawat Inap Rumah Sakit Sanjiwani Gianyar

Made Sudiarsa, I Ketut Sutapa

Abstract


A construction project is a series that is only implemented once and is generally short-term, with limited resources. Before the implementation of a construction project runs, it usually starts with the preparation of a work plan and a project implementation time (time schedule). The realization of work plans in the field often experiences delays in the process, because revenue realization is very much determined by the selection of the payment system used by the contractor which will affect the project cash flow (cash flow), the amount of working capital required, the progress of a job, and to determine policy alternatives. that needs to be done so that the project does not experience a deficit. This study aims to determine the payment system that requires less working capital and benefits the contractor in terms of project benefits. The analysis uses 2 alternative policies carried out by the contractor during the project, alternative 1 by making a loan to the bank and alternative 2 with a material payment policy. From the results of this research analysis, it is found that the MC payment system does not require working capital because the project cash flow condition is always a surplus, while the term payment system requires working capital in the form of a bank loan of IDR 410,000,000.00 so that the project cash flow condition does not experience a deficit, as was done. on policy alternatives 1.

Keywords


Cash Flow, Sistem Pembayaran, Modal Kerja

Full Text:

PDF

References


. Wulfram, Ervianto. 2004 . Manajemen Proyek Konstruksi . Yogyakarta : ANDI

. Yuda, C.G.P., 2015, Analisis Perbandingan Keuntungan Kontraktor Akibat Penjadwalan EST dan LST Dengan Sistem Monthly Payment Dan Progress Payment Pada Proyek Gedung Rawat Inap RSUD Wangaya, Fakultas Teknik Universitas Udayana, Bali.

. Kerzner . 1982 . Project Management for Executives . New York : Van Nostrand Reinhold

. Soeharto, Iman. 1995 . Manajemen Proyek dari Konsepsual Sampai Operasional . Jakarta : Erlangga

. Dipohusodo . 1996 . Manajemen Proyek Kontruksi . Jakarta : Jilid 2

. Asiyanto . 2005 . “Construction Project Cost Management” . Jakarta : Pradyna Paramita

. Irika Widiasanti dan Lenggogeni . 2013 . “Manajemen Konstruksi”. Bandung : Remaja Rosdakarya

. Sawitra Punarbawa . 2016 . Analisis Aliran Arus Kas (Cash Flow) Pada Proyek Pembangunan Puskesmas I Abiansemal Berdasarkan Cara Pembayaran. Jimbaran : Politeknik Negeri Bali

. Martho F. Tolangi, dkk, “Analisis Cash Flow Optimal Pada Kontraktor Proyek Pembangunan Perumahan”, Jurusan Teknik Sipil, Universitas Sam Ratulangi, Vol.1 No. 1, (60-64), November 2012




DOI: http://dx.doi.org/10.30630/jipr.16.2.195

Refbacks

  • There are currently no refbacks.