MANAJEMEN MATERIAL SUBSTRUCTURE DENGAN METODE MATERIAL REQUIREMENT PLANNING

Jajang Atmaja, Riswandi Riswandi, Monika Natalia, Riry Maifrianti, Fitri Hidayati

Abstract


Project management planning on sub structure area, very important to ensure efficient and effective construction projects. This research was purposes managing the sub structure material on precast pile and sloof using the material requirement planning (MRP) method in flat residence in West Sumatera. The scope research were the lot for lot (LFL) bar bending schedule and contingency plan (to minimize wasted material). The results of the analysis of study, the implementation of the MRP method (LFL technique) consists of cost of material planning on shop drawing, which was Rp.1,488,562,000,00; cost of material requirement planning by the lot for lot (LFL) technique was Rp.1,477,837,249,00; realization cost by combining the LFL technique and contingency plan is Rp.1,478,143,808,00. Calculation of the quantity and cost of reinforcing steel using the MRP method (LFL technique) by the bar bending schedule better than using the contingency method. Using bar bending schedule was more efficient, because it makes the remaining reinforcing steel after cutting was calculated properly.

Keywords


Management material sub structure, Material requirement planning, Contingency plan

Full Text:

PDF

References


Maddeppungeng, A. Setiawati, D, N. & Tuqa, B. “Perencanaan Persediaan Material dengan Menggunakan Metode Material Requirement Planning (MRP) pada Proyek Apartemen (Studi Kasus: Proyek Pembangunan Nines Plaza & Residence Tower B)”, Fondasi: Jurnal Teknik Sipil, volume 10, no, 1, pp 69-80, 2021.

Mudita, P, K. Sudarsana, I, K. & Nadiasa, M. “Analisis Faktor-Faktor yang Mempengaruhi Waktu Tunggu Pengadaan Material Konstruksi pada Proyek Gedung di Kabupaten Badung”, Jurnal Spektran, volume 4, nomor 2, pp 18–26, 2016.

Aditama, R. “Analisis Biaya dan Waktu Menggunakan Metode EVM (Earned Value Method) Pada Proyek Konstruksi (Studi Kasus Pada Proyek Pembangunan Gedung Laundry RSUD Sidaorjo)”, Untag Surabaya, pp 7-36, 2021.

Bawimbang, R, M. Tjakra, J.& Mangare, B. “Pengendalian Material Proyek Dengan Metode Material Requirement Planning pada Pembangunan Office and Distribution Center Airmadidi, Minahasa Utara, Sulawesi Utara”. Jurnal Teknik Sipil Statik, volume 8, no. 1, pp 127–134, 2020.

Wohos, I, P. Mandagri, R, J, M.& Walangitan, D, R, O. ‘Pengendalian Material Proyek dengan Metode Material Requirement Planning pada Pembangunan Star Square Manado”, Teknik Sipil, volume 12, no. 61, pp 25–34, 2014.

Maury, J. Dundu, A, K, T. & Arsjad, T, T. “Perencanaan Biaya Berdasarkan Jumlah dan Waktu Pemesanan dengan Metode MRP (Material Requirement Planning) (Studi Kasus: Dilakukan pada Proyek Pembangunan Terminal Akap Tangkoko Bitung)”, Jurnal Sipil Statik, volume 6, no. 10, pp 861–866, 2018.

Handayani, S. & Suswanti, L., 2003. “Perancangan Pengendalian Material Dengan MRP (Material Requirement Planning) pada Proyek Konstruksi”, Tugas Akhir. Universitas Islam Indonesia. 2003.

Kristiawan, N, J. Riani, L, P. & Septi, D, A. “Analisis Perencanaan Pengadaan Material Bahan Bangunan pada PT Dhaha Jaya Persada Menggunakan Metode MRP (Material Requirements Planning) Guna Efisiensi Biaya”. Seminar Nasional Manajemen Ekonomi Akuntansi (SENMEA) UNPGRI KEDIRI, pp 445– 449. 2017.

Azis, S, A & Sutoni, A. “Analisis Persediaan dalam Proyek Renovasi Gedung Menggunakan Metode Material Requirements Planning dengan Teknik Lot For Lot” Seminar dan Konferensi Nasional IDEC, Surabaya, pp A03.1-A03.8, tanggal 2-3 Mei 2019.

Siswanto, A, B. & Riza, M, H. “Analisis Manajemen Material pada Proyek Saluran dengan Metode Material Requirement Planning”, Jurnal Teknik Sipil, volume 14, no. 2, pp 10–24, 2021.

Julia Martins, “8 Langkah Membuat Rencana Kontingensi untuk Mencegah Risiko Bisnis”, https://asana.com/id/resources/contingency-plan • Asana. diakses pada 20 Oktober 2022,




DOI: http://dx.doi.org/10.30630/jipr.18.2.288

Refbacks

  • There are currently no refbacks.